Bamboo-for-PlasticINDUSTRIAL DIGITAL PLATFORM
中文
◎Home ▤News ✦Q&A ▦Compare ❖Glossary ▣Data ◫Scenarios ☰About ❖ Knowledge baseFive modulesEnter →
Five Systems ↗
Enter Platform
Home/Industry Q&A/Certification & Compliance
CERTIFICATION & COMPLIANCE

How are the PPWR A/B/C recyclability grades calculated, and where can bamboo packaging land?

SHORT ANSWER

By the recyclable share of the packaging unit's weight: A ≥ 95%, B ≥ 80%, C ≥ 70%, with anything below 70% technically non-recyclable. From 1 January 2030, or 24 months after the Article 6(4) delegated act, whichever is later, nothing below C may be placed on the market; from 1 January 2038 only A and B remain. Mono-material bamboo packaging assessed in the paper stream usually grades well — composite structures are where points are lost.

The unit of assessment is the packaging unit, not the material. A bamboo-fibre box with a PET window, an aluminium laminate or a non-separable label loses recyclable share by weight, and the grade drops with it. Lightweighting has a limit too, because the share is weight-based: thinning the body raises the relative weight of the foreign components.

The delegated act is not yet in force. Article 6(4) requires design-for-recycling criteria by 1 January 2028; until then, Commission guidance allows continued use of EN 13430:2004 as the assessment basis. The EN 18120 series on design for recycling of plastic packaging has been published, but does not yet confer a presumption of conformity.

The real tension for bamboo is compostable versus recyclable. Paper-stream recycling requires no plastic coating and no inseparable additives; an EN 13432 claim requires the whole article to pass. The two are rarely satisfied at once, so the product has to choose a lane — this is the most frequently misread interaction between PPWR and the SUP Directive.

Practical advice: design mono-material from the start — single bamboo-fibre body, water-based coating, wash-off label, no metal insert. Every foreign component removed improves both the grade and the EPR fee, because both now read from the same design decision.

KEY DATES AND FIGURES
Grade A≥ 95% recyclable by weight
Grade B≥ 80% — the floor from 2038
Grade C≥ 70% — the floor from 2030, exits the market in 2038
2030-01-01Below C cannot be placed on the market (or 24 months after the delegated act, if later)
2038-01-01Only grades A and B remain
Interim basisEN 13430:2004; DfR delegated act due by 2028-01-01
SOURCES
  • EUR-LexRegulation (EU) 2025/40, Article 6 and Annex II Table 3