Yes. The usual sequence is requirement definition (category, specification, certification target, destination market), formulation and structure proposal, sampling and in-house testing, third-party testing for compostability and food contact, pilot production, then volume. The binding precondition is fixing the certification route first — change the substrate or an additive later and the testing starts over.
Four things must be fixed before sampling: the destination market's requirements (EN 13432 or ASTM D6400, food contact or not), the use conditions (temperature, fat content, microwave), the pack and logistics format, and which claims may appear on the label. The fourth has been a hard constraint since (EU) 2024/825.
Sequence certification first. Confirm on a small sample that the substrate can pass degradation and migration, then cut tooling. Do it the other way and a non-compliant additive is discovered after the mould exists, which means a new mould.
During pilot production, watch stability rather than a single impressive result: weight, dimension and strength variation across three consecutive lots says more about volume readiness than one good report — and it is what a buyer's factory audit looks at.
Put the private-label boundaries in the contract: who owns the formulation, in whose name the certificate is held, who carries a compliance failure, and who pays for retesting when the customer changes the material. Four clauses that prevent most later arguments.